Skip to content

PROJECT
PROFILE

WESTERN MICHIGAN UNIVERSITY
Arcadia Flats | Student North Housing
Kalamazoo, Michigan

first top panel being set in place
exterior of building with panels in place
building exterior shot

ABOUT THE PROJECT

After receiving the design intent for the project, Centerline provided recommendations to the owner utilizing a design-assist delivery for the exterior building enclosure. Centerline worked with the architect and engineer of record to develop and coordinate panel details that met with the owner’s design intent. As a design-assist partner, we evaluated the performance of the panel systems and their constructability while maintaining project budget commitments.

Read more about the project on Building Enclosure Online!

PROJECT DETAILS

  • Sto Metal ci and Sto Backup Panels
  • 206 exterior wall panels totaling 70,600 sq feet
  • Facade designed to have protruding windows that will be incorporated into panels
  • Six-story facade
  • Sto Metal ci panel height 43 feet
  • Groundbreaking in 2018 with completion in 2020